000 | 01439cam a22003138a 4500 | ||
---|---|---|---|
001 | CIA01000000000000000072548 | ||
005 | 20250326113824.0 | ||
008 | 051116t20032003mauad rb 001 0 eng d | ||
900 | _aBK | ||
010 | _a2003045193 | ||
020 | _a0750651296 | ||
040 |
_aDLC _cDLC _dDLC _dUIA P |
||
050 | 0 | 0 |
_aTS 183 _bS23 |
100 | 1 |
_aScallan, Peter _9139814 |
|
245 | 1 | 0 |
_aProcess planning : _bthe design/manufacture interface |
260 |
_aBoston, Massachusetts _bButterworth-Heinemann _cc2003 |
||
300 |
_axii, 483 p. _bil., tbs. _c24 cm. |
||
440 | 0 |
_aEngineering _pManufacturing _9139815 |
|
504 | _aIncluye referencias bibliográficas e índice. | ||
505 | 0 |
_tIntroduction to Manufacturing -- _tWhat is Process Planning? -- _tDrawing Interpretation -- _tMaterial Evaluation and Process Selection -- _tEquipment and Tooling Selection -- _tProcess Parameters -- _tWorkholding Devices -- _tSelection of Quality Assurance Methods -- _tEconomics of Process Planning -- _tFrom Design to Manufacture. |
|
650 | 4 |
_aProcesos de manufactura _9110795 |
|
856 | 4 | 0 |
_zPublisher description _uhttp://www.loc.gov/catdir/description/els031/2003045193.html |
856 | 4 | 0 |
_zTable of contents _uhttp://www.loc.gov/catdir/toc/els031/2003045193.html |
903 |
_aLUCERO _b20 _c20051025 _lCIA01 _h1024 |
||
903 |
_aJUANJOSE _b30 _c20051116 _lCIA01 _h1122 |
||
903 |
_aALEPH14 _b30 _c20051220 _lCIA01 _h1430 |
||
903 |
_c20141127 _lCIA01 _h2301 |
||
999 |
_c159597 _d159597 |